Monday, March 31, 2014

Mast step

Finally, we are getting some nice weather. The yard is a swamp and getting to the shed is like walking through it.  I did get the mast step built.  I used the peg leg from the Abbott.  As you can see in the pix, Griff is a lower boat. That leg sits flush with the Abbott deck. We'll have to put them next to each other to see how much difference there is.   Also put the tiller on the rudder just to see how that worked.



No comments:

Post a Comment